31 January 2019
ABOUT BANGKOK SYNTHETICS (BST)
DETAILS
Toyo Engineering Korea Limited
(Toyo-Korea, President and CEO Toru Osanai),
a Korean subsidiary of Toyo Engineering Corporation
has been awarded
Engineering, Procurement and Construction project
from Bangkok Synthetics Company Ltd. (BST),
a major C4 downstream product manufacturer of Thailand.
This project involves
construction of 1,3-Butadiene & Butene-1 production units
total capacity of 80 KTA & 34 KTA, respectively,
at BST’s existing petrochemical complex
in Map Ta Phut, Rayong, Thailand.
The plant is scheduled for completion in 2021.
This is an EPC project following
the Front End Engineering Design (FEED) contract
awarded to Toyo-Korea at the end of 2017.
Contract Summary
Client : Bangkok Synthetics Company Limited (BST)
Contractor : Toyo Engineering Korea Limited (Toyo-Korea)
Site : Map Ta Phut, Rayong, Thailand
Facilities : 1,3-Butadiene (80 KTA) &
Butene-1 production units (34 KTA)
Contract Type :
Turnkey lump sum for
detailed engineering, procurement, and construction
Completion : 2021 (scheduled)
WWW.CHEMWINFO.COM BY KHUN PHICHAI